Consequences engine
Cost & timeline cascade
Pick a program to see how each at-risk swim lane cascades into downstream cost and timeline impacts across the other teams.
Cascading delay (peak)
14d
Across downstream lanes
Cost cascade (total)
$0.95M
Forecast variance to budget
Active consequences
4
Live cascade links
Cascade Map
Source → Target- G2OperationssourceG3Installationtarget+14d+$320khigh
Vendor SLA gap pushes pilot fixture delivery into G3 window.
- G2OperationssourceG3Financetarget+0d+$480khigh
Expedited freight to recover schedule adds line-item cost.
- G2FinancesourceG3Designtarget+7d+$90kmed
Tariff revision forces material respec on 2 SKUs.
- G2OperationssourceG3Engineeringtarget+9d+$60kmed
POS firmware integration window shifts right.
Impact by Team
Design
$90k
+7d schedule slip
Finance
$480k
+0d schedule slip
Operations
Clear
No impact
Installation
$320k
+14d schedule slip
Engineering
$60k
+9d schedule slip