Launch readiness

Gate Readiness. Lane by lane.

Pick a program to see every swim lane's readiness across the six phase gates, the critical path controlling the launch, and where each team stands right now.

Program
NMS-001 · Atlas FW26 Flagship
Current gate
G2 · Concept Review (PCR)
Critical path
Operations lane
Projected slip
+14 days
Original target
Sep 12, 2026
Projected launch (with delays)
Sep 26, 2026
NMS-001 kickoff— slip 14d →
Swim lane
Gate 1
Program Inception
Gate 2
Concept Review (PCR)
Gate 3
Engineering Review
Gate 4
Prototype 1
Gate 5
Prototype 2
Gate 6
Mass Production
Design
29% complete
idle
idle
idle
idle
Finance
25% complete
Tariff revision pending
idle
idle
idle
idle
OperationsCritical Path
20% complete
Vendor SLA unsigned
idle
idle
idle
idle
Installation
23% complete
idle
idle
idle
idle
Engineering
26% complete
idle
idle
idle
idle
ReadyAt RiskBlockedCritical path lane